During the construction of the 2,900-ft-long tunnel/depressed roadway section of the Atlantic City-Brigantine Connector, a shallow penetrating dewatering system ensured a dry excavation while minimizing offsite groundwater drawdown.
The 2.4-mile-long Brigantine Connector connects the Atlantic City Expressway with the marina district of Atlantic City, NJ, and Brigantine Island. To alleviate community noise concerns where a portion of the connector alignment would pass through a residential area, the design of the new highway included a deep cut-and-cover tunnel. The approximately 2,900-ft-long tunnel/depressed roadway section, which runs directly alongside the Penrose Canal, required excavation up to 35 ft. With groundwater at approximately five feet below working grade, dewatering was required throughout the excavation and construction process.
Site soils through which excavation would take place consisted of a shallow but extensive compressible meadow mat, clean beach sands down to a depth of approximately 60 ft, a lower permeability silty sand stratum, and a deeper, highly permeable coarse sand and gravel aquifer beneath. The presence of the compressible meadow mat layer posed concerns regarding potential settlement along the connector alignment because of widespread groundwater lowering outside of the excavation limits. Therefore, it was imperative that the dewatering system installed would limit drawdown outside the excavation support system and minimize offsite effects.
Keller worked with clients to develop a solution using the excavation support in combination with a shallow penetrating dewatering system that would ensure a dry excavation while minimizing offsite groundwater drawdown. The design consisted of:
Driving the sheet piling deeper than would normally be required for the depth of excavation provided a partial groundwater cut-off and reduced the amount of natural inflow into the excavation area. Limiting the depth of penetration of the dewatering system to the depth of the perimeter sheeting substantially limited the volume of offsite groundwater drawdown yet adequately dewatered the deep interior excavation to 28 ft below sea level. The effectiveness of the design approach was verified early on with several aquifer pumping tests.
A crane-supported hole puncher and casing were used to jet each well to the design depth within the steel sheet piling on either side of the excavation. The wells were constructed with a 6-in. diameter slotted well screen that could accommodate a wide range of submersible pumps. Depending on the depth of the excavation, the wells were spaced 30 to 60 ft apart. Surface discharge piping conveyed the pumped water into the adjacent canal.
The system operated continuously throughout the 16-month excavation and construction period. The excavation subgrade was kept dry while negligible drawdown was measured outside of the excavation at the depths of the meadow mat compressible layer. No settlement or damage to nearby structures was observed.
Source: Brigantine Connector
Dewatering wells effectively lowered groundwater levels up to 60 ft before excavation of the shaft...
When subjected to wet and dry cycles, the claystone bedrock exhibited expansion and contraction, be...
Keller performed construction dewatering and excavation support during the Bear Creek Dam remediati...
The new LRT line intersected beneath the existing Toronto Transit Commission (TTC) subway tunnel at...
In downtown Baltimore, increased flooding and impacted train operations led to a complete replaceme...
Maine Medical Center is northern New England’s largest hospital and a leading heart care, orthopedi...
While Keller is renowned throughout the world for its wide range of geotechnical solutions, perhaps...
It’s a place Keller knows incredibly well, having been involved in virtually every building develop...
Keller was contracted to install support of excavation for launch and receiving shafts to connect a...
Looking for more information? Fill in the form and we will contact Keller for you.