Hubbell's ROCK-IT™ Lead Section is an innovative solution to penetrate rocky or high blow count soils without pre-drilling or field modification.
The single carbide, patent pending design was developed after site testing of several rock anchor configurations to provide an economical, yet proven solution to reach load-bearing depths in high blow count material.
Some of ROCK-ITâ„¢ Key Benefits are wear resistant, offset carbide tip designed to break through rocky soil, the reduced installation time to save time and money
Find more information about Hubbell's ROCK-ITâ„¢ Lead Section here.
Source: Hubbell
BACKGROUND Built in 1901, the historic train station is located in Downtown Richmond. The city is r...
Soil structures refer to constructions that involve the use of soil as a fundamental building mate...
The Hubbell CHANCE® Helical Pier Foundation System gives you the performance of concrete without the...
Keller is leading the way for ground-improvement works on the largest infrastructure project in the...
Keller helped provide a solution to stabilize a cliff face and protect an iconic building in North...
TheStructuralEngineer.info is glad to present Hubbell's - CHANCE® Combination (SS-RS) Helical Cast T...
Keller recently brought its engineering expertise and experience of working on open water to a chal...
Hayward Baker teamed up with McKinney Drilling Company and GEO-Instruments, Inc. to work on a Soil N...