When unexpected movement and ground disturbance occurred following drilled shaft installation, Keller performed preventative grouting to keep the project on track.
Chaplin is a new underground station for the Eglinton Crosstown LRT, part of the Toronto subway system. As others installed drilled shafts, unexpected soil conditions on one shaft led to severe sand caving and disturbances. The general contractor proposed a preventative grouting program to ensure that the adjacent shafts, critical to project completion, were founded on adequate soils with appropriate bearing capacity.
Learn more about Keller North America's Underpinning Solutions
The owner set a strict project schedule, and grouting had to be done within a tight window to get the project back on track.
Grouting would stabilize the soil around two drilled shafts without causing excessive movement or soil fracturing. A cementitious grout mix was injected via multiple port sleeve pipes under high pressure from the underside of the shafts to approximately 9.8 ft (3m) below the underside of the shaft. A total of 244 cubic ft (6.9 cubic meters) of grout were injected at eight grouting locations with five grouting ports per location.
Keller evaluated grout takes, pressures and movement monitoring to determine if further grouting was required, but the initial preventative grouting program proved successful in stabilizing the shafts and allowing construction to continue.
Learn more about Keller North America's High mobility (cement slurry) grouting technique
Source: Chaplin Station
In downtown Baltimore, increased flooding and impacted train operations led to a complete replaceme...
Keller team is working on the iconic Brooklyn Bridge in New York City, using jet grouting to rehabi...
Sunrise Hospital and Medical Center sits on a 30-acre campus. The owner undertook a $130 million, mu...
As part of Massport’s 4-year Capital Program, a multi-billion-dollar upgrade initiative was launche...
The South Shore Water Reclamation Facility on the coast of Long Island, New York, is undergoing a m...
Keller applied ground freezing in the largest infrastructure project ever conducted in Suffolk Coun...
After months of careful design planning and on-site expertise, Keller has successfully completed a...
Keller was contracted to install support of excavation for launch and receiving shafts to connect a...
Dewatering wells effectively lowered groundwater levels up to 60 ft before excavation of the shaft...
Looking for more information? Fill in the form and we will contact Keller for you.